Bethlehem Steel
   About Bethlehem Steel      Services      Products      Facilities




   CONTACT US      Environmental Progress      News Room      HOME  Site Map/Search
  Restructuring
   - PBGC Website
   - Employee Benefits
   - Customer Communications
   - Supplier Communications
  Customers

   - Customer Corner
   - Credit

  Suppliers
   - Conditions and Policies
   - Invoice Status
       - Obtain Invoice Status UserID
  Investors
   - 2002/2001 Financials
   - Other Information
  Employees
   - HR Programs
   - Medical Plan Comparisons
   - Notice of Privacy Practices
Bethlehem Steel: About Us
  Bethlehem Steel: Press Room

News Releases  •  Image Bank  •  Executive Profiles  •  Steelmaking Process  •  History   •  Restructuring Past Announcements  •  Video Players and Downloads

Burns Harbor Image Bank

Index Page

NOTE: If you are a trade or news media and require hi-res images for a story, please click here to request images for download via Bethlehem Steel's FTP site.

Page 1
  • 1 automotive panels lfr
  • 2 vacuum degassing
  • 3 galvanneal line schematic
  • 4 ladle treatment station-argon stirring
  • 5 Walbridge Coating inspection station
  • 6 GM flag
  • 7 auto underbody
  • 10 thickness guage-Walbridge Coating
Page 2
  • 11 man in tandem mill control pulpit
  • 12 plate mill control pulpit
  • 13 slab grinding-plate mill
  • 14 laser alignment shearing-plate mill
  • 16 fuel tank illustration
  • 18 field of coils
  • 19 continuous slab caster-torch cutting
  • 20 AB cover-HDCL,strip exiting pot
 
Page 3
  • 21 AB-man in coil field at HDCL
  • 22 AB-automobile
  • 24 FB-employee inspecting coil
  • 25 FB-hot mill finishing stands
  • 26 FB-employees fishing at dock
  • 27 coke ovens
  • 28 FB-GM Camaro/Burns Harbor logo
  • 30 FB-employee reflection in truck
Page 4
  • 31 FB-prep coil for shipping
  • 33 FB-employee in control pulpit
  • 35 FB-Burns Harbor aerial view
  • 37 FB-backhoe-customer products
  • 38 FB-Burns Harbor employees
 
Page 5
  • 42 slabbing mill
  • 43 plate exiting finishing stand
  • 44 slab entering 160 inch roughing stand
  • 45 BOF hot metal charge
  • 46 BOF hot metal charge
  • 47 BOF scrap charge
  • 49 mill/environment
  • 50 tapping blast furnace
Page 6
  • 52 torch cutting slab-continuous caster
  • 54 5-stand tandem mill
  • 55 continuous slab caster
  • 56 cast slabs on piler table at runout
  • 57 plate mill
  • 58 160" plate mill
  • 59 Deerfield Woods training center
 
Page 7
  • 61 Burns Harbor-main office building
  • 63 entry looping tower
  • 64 80" Hot Strip Mill reheat furnace-discharging slab
  • 65 vacuum degasser
  • 68 Burns Harbor main plant entrance
  • 69 cast floor at blast furnace
  • 70 view of 'D' blast furnace
Page 8
  • 71 plate at 160 inch leveler
  • 74 waste water treatment plant
  • 77 stacker reclaimer piling ore
  • 79 Burns Harbor-main gate
  • 80 pushing coke from coke oven
 
Page 9
  • 81 coil field
  • 82 turntable at no. 2 caster
  • 83 alloy additions made while tapping BOF
  • 85 coils-parts display-automotive
  • 87 taking sample at BOF
  • 88 charging hot metal into BOF
  • 89 surveyor at Burns Harbor construction site-1962
  • 90 inspecting plate before shipment
Page 10
  • 91 hot rolled band at coiler
  • 92 plate cooling bed
  • 93 construction of blast furnace
  • 94 water discharge test
  • 96 continuous heat treat line
  • 97 coil package inspection
  • 98 construction of Port of Indiana
  • 100 slab scarfing
  • 101 unloading ore vessel

Image Bank Home

   
 
Privacy Statement
�2001, Bethlehem Steel Corporation