Page 1
- 1 automotive panels lfr
- 2 vacuum degassing
- 3 galvanneal line schematic
- 4 ladle treatment station-argon stirring
- 5 Walbridge Coating inspection station
- 6 GM flag
- 7 auto underbody
- 10 thickness guage-Walbridge Coating
|
Page 2
- 11 man in tandem mill control pulpit
- 12 plate mill control pulpit
- 13 slab grinding-plate mill
- 14 laser alignment shearing-plate mill
- 16 fuel tank illustration
- 18 field of coils
- 19 continuous slab caster-torch cutting
- 20 AB cover-HDCL,strip exiting pot
|
| |
Page 3
- 21 AB-man in coil field at HDCL
- 22 AB-automobile
- 24 FB-employee inspecting coil
- 25 FB-hot mill finishing stands
- 26 FB-employees fishing at dock
- 27 coke ovens
- 28 FB-GM Camaro/Burns Harbor logo
- 30 FB-employee reflection in truck
|
Page 4
- 31 FB-prep coil for shipping
- 33 FB-employee in control pulpit
- 35 FB-Burns Harbor aerial view
- 37 FB-backhoe-customer products
- 38 FB-Burns Harbor employees
|
| |
Page 5
- 42 slabbing mill
- 43 plate exiting finishing stand
- 44 slab entering 160 inch roughing stand
- 45 BOF hot metal charge
- 46 BOF hot metal charge
- 47 BOF scrap charge
- 49 mill/environment
- 50 tapping blast furnace
|
Page 6
- 52 torch cutting slab-continuous
caster
- 54 5-stand tandem mill
- 55 continuous slab caster
- 56 cast slabs on piler table at runout
- 57 plate mill
- 58 160" plate mill
- 59 Deerfield Woods training center
|
| |
Page 7
- 61 Burns Harbor-main office building
- 63 entry looping tower
- 64 80" Hot Strip Mill reheat furnace-discharging slab
- 65 vacuum degasser
- 68 Burns Harbor main plant entrance
- 69 cast floor at blast furnace
- 70 view of 'D' blast furnace
|
Page 8
- 71 plate at 160 inch leveler
- 74 waste water treatment plant
- 77 stacker reclaimer piling ore
- 79 Burns Harbor-main gate
- 80 pushing coke from coke oven
|
| |
Page 9
- 81 coil field
- 82 turntable at no. 2 caster
- 83 alloy additions made while tapping BOF
- 85 coils-parts display-automotive
- 87 taking sample at BOF
- 88 charging hot metal into BOF
- 89 surveyor at Burns Harbor construction site-1962
- 90 inspecting plate before shipment
|
Page 10
- 91 hot rolled band at coiler
- 92 plate cooling bed
- 93 construction of blast furnace
- 94 water discharge test
- 96 continuous heat treat line
- 97 coil package inspection
- 98 construction of Port of Indiana
- 100 slab scarfing
- 101 unloading ore vessel
|